- Building
- Grade II listed townhouse, c.1820
- Outcome
- Six-bedroom townhouse · Two apartments
- Consent
- Planning & Listed Building Consent, January 2023
- Completed
- Building Control sign-off, November 2023
At 65 Lemon Street, SMT Associates secured planning permission and Listed Building Consent to return a substantial Grade II listed townhouse to residential use, together with a rear extension providing two additional apartments.
The project required a coordinated response to conservation objections, commercial viability, structural alterations and demanding fire-safety requirements. Our involvement began before purchase and continued through design, planning negotiations, technical coordination and completion.
The result is a six-bedroom townhouse with two independent rear homes, retaining an exceptional collection of historic interiors while establishing an economically sustainable future for the property.
Advising before purchase
Dating from approximately 1820, Number 65 forms part of the formal historic townscape of Lemon Street within the Truro Conservation Area.
Behind its granite frontage, the building retained its original oval-plan staircase, panelled doors, shutters, sash windows and extensive decorative plasterwork.
The property had been used as offices since 1953. Later partitions, fire lobbies and services had obscured aspects of its domestic character, but much of the original arrangement and significant fabric survived.
We inspected the building and advised on its condition and development potential before acquisition. Acting on our advice, the clients purchased before planning permission had been secured, enabling them to negotiate a favourable deal while accepting the associated planning risk.
Early feasibility work was therefore critical. The proposals needed to be capable of gaining consent, meeting Building Regulations and delivering a financially workable development.
Making the project viable
Returning the principal building to a single townhouse offered an appropriate use for its historic rooms and circulation. However, that conversion alone did not provide a viable development model.
Our strategy included extending and separating the later rear wing to create two additional apartments. These homes were essential to the financial viability of the overall project.
This allowed new accommodation to be concentrated in the part of the site with greater capacity for change, reducing pressure to subdivide the important rooms within the original townhouse.
Our Heritage Impact Assessment explained the relationship between the additional accommodation, the conservation approach and the economic case for bringing the building back into use.
Resolving objections through redesign
Although the return to residential use was supported in principle, the initial rear extension attracted objections. Truro City Council and the Conservation Area Advisory Committee raised concerns about its length, scale and relationship with the listed building.
We undertook detailed consultations with planning and conservation officers and revised the scheme to address those concerns while retaining the two apartments needed for viability.
The two-storey extension was shortened to align with the neighbouring rear wing, with a smaller single-storey element introduced at its outer end. An external staircase was removed and access to the upper apartment brought inside. Layouts, joinery and service arrangements were also refined.
The revised proposals gained support, and planning permission and Listed Building Consent were granted in January 2023.
Heritage evidence supporting the application
Our Heritage Impact Assessment, Design and Access Statement and planning justification connected an understanding of the building with the proposed works.
The heritage assessment identified the significance of the surviving interiors and distinguished these from later alterations. The Design and Access Statement explained the layout, appearance, access and reasoning behind the scheme, while the planning case addressed the extension and its contribution to viability.
This information supported informed negotiation. It explained how the principal townhouse could be protected while accommodating sufficient development to make its repair and reuse achievable.
Meeting Building Regulations while retaining historic fabric
The height of the townhouse and its accommodation over four levels presented a significant fire-safety challenge. Conventional solutions, including an additional escape stair or extensive overboarding, would have affected the original staircase, decorative ceilings and historic finishes.
SMT coordinated the structural engineer, fire consultant and specialist designers, working with Building Control to develop a strategy that protected occupants while retaining the historic interior.
A sprinkler system was installed in response to the building’s height and number of floors, alongside comprehensive automatic fire detection and protected escape arrangements. Specialist fire-protection treatments and upgrading systems enabled historic doors and ceilings to be retained while achieving the required fire performance.
Service routes, sprinkler heads and detection equipment were carefully integrated into the design. Structural alterations and fire and acoustic separation between the townhouse and rear apartments were coordinated within the technical proposals.
En-suite facilities were integrated into a number of bedrooms, with layouts and service routes carefully coordinated to retain the proportions of the historic rooms and protect original structure, plasterwork and joinery.
These measures were central to delivering accommodation that met regulatory requirements while preserving the features that made the building significant.
Integrating ventilation and energy improvements
A whole-house mechanical ventilation with heat recovery system (MVHR) was installed, supplying fresh air to living spaces and bedrooms while extracting moisture-laden air from the kitchen, bathrooms and en-suites.
Ductwork was carefully routed through floor voids, cupboards and new ceiling zones to limit disturbance to historic plasterwork and decorative features. This provided controlled ventilation and heat recovery while retaining the character of the listed interior.
Energy improvements required similarly careful consideration. Standard insulation approaches risked concealing cornices, shutters, panelled reveals and lime plaster, or altering the moisture behaviour of the traditional construction.
We prepared a detailed Building Regulations case explaining these constraints and supporting proportionate improvements appropriate to the building.
A completed and sustainable outcome
The completed scheme comprises the six-bedroom townhouse, a ground-floor one-bedroom apartment and an upper studio apartment. Separate Building Control final certificates were issued in November 2023.
For clients who purchased before consent, securing the rear extension and carrying the coordinated scheme through to completion was an important result. The additional apartments made the development viable, while the principal building regained its residential use with its staircase, doors, shutters and decorative ceilings retained.
65 Lemon Street demonstrates how early advice, persistent planning negotiation and coordinated technical design can unlock a challenging listed-building project and carry it through to completion.
← Back to all projects