Trescol Vean, Baldhu

New planning policy unlocking consent for two houses outside a settlement

Conversion
Former school and nursery to four apartments
New homes
Two houses outside a settlement
Heritage
Grade II* former church · Mining World Heritage Site
Client relationship
Since 2004

At Trescol Vean, SMT Associates secured planning permission for two new houses outside a settlement, building on our earlier work to convert the former school and nursery into four apartments.

The two-house consent represents an important development in our involvement with the property. By identifying opportunities arising from changes to national planning policy and applying them to the site’s particular circumstances, we developed a case for new residential development within a sensitive historic setting.

The achievement brought together planning-policy analysis, architectural design and detailed heritage assessment. The proposals needed to address both the principle of new housing in this location and its relationship with the nearby Grade II* listed former church and the Cornwall and West Devon Mining Landscape World Heritage Site.

With the four apartments nearing completion and consent secured for the additional houses, Trescol Vean demonstrates how a long-standing understanding of a property can help identify and realise further development potential.

A client relationship spanning more than twenty years

Our relationship with the clients began in 2004, when we assisted with the installation of a new floor at Chuckles Nursery in Perranwell.

In 2007, we undertook the pre-purchase survey of Trescol Vean, providing advice on the former school building before its acquisition. Our involvement continued with adaptations to support its nursery use, including mezzanine accommodation.

These commissions established practical knowledge of the building’s construction, condition and internal arrangement. That understanding became valuable when the clients subsequently explored a residential future for the property.

Our involvement has therefore followed the property through successive stages: acquisition advice, adaptation for nursery use, residential conversion and the identification of opportunities for additional homes.

Converting the former nursery into four apartments

Initial conversion proposals were refined into a reduced scheme of four apartments, with accommodation arranged over one and two storeys.

The challenge was to introduce residential layouts within a building originally designed for a different purpose. Floor levels, headroom, stairs, daylight, privacy and access needed to work together while retaining the character and architectural presence of the former school.

SMT Associates brought together survey, design, planning and technical work to develop the proposals around those constraints.

Planning permission for four residential units was secured in July 2023. A subsequent Section 73 submission addressed refinements to layouts and external openings, supported by explanations of the improvements to daylight, accommodation and privacy.

Our Design and Access Statement connected the drawings with the reasoning behind the scheme, explaining how the proposed homes could function within the existing building.

With the apartments now nearing completion, the former nursery is entering a new phase while retaining its recognisable place within Baldhu.

Recognising the opportunity in new planning policy

Alongside the conversion, we examined the development potential of the adjoining former playground and parking area.

Its location outside a settlement made the principle of new housing a central planning consideration. The site’s history as part of the school and nursery complex, its existing hardstanding and its relationship with surrounding buildings were important to assessing the opportunity.

Changes to national planning policy provided a stronger basis for considering appropriate development in such locations. Policy S5 of the National Planning Policy Framework expressly addresses development outside settlements, including redevelopment of previously developed land and limited infilling within groups of houses. National Planning Policy Framework, Policy S5 Our planning case drew on those opportunities, relating the policy provisions to the site’s previous use, physical characteristics and position within the existing building group.

The work involved connecting policy interpretation with a specific, deliverable design. The supporting submissions explained why two houses could be accommodated here and how the proposal responded to the site’s heritage, access and design considerations.

Securing consent for two new houses

SMT Associates developed and secured planning permission for two linked, two-storey, three-bedroom houses, together with demolition of the former toilet block and associated access, parking and landscaping.

The houses face the former school in a courtyard arrangement. Lower ridges, stepped levels and subordinate linking garages establish a relationship with the existing buildings while allowing the new accommodation to function as individual homes.

The principal stone boundary walls and existing entrance are retained.

Simple building forms, slate roofs and restrained detailing respond to the surrounding architecture, with gardens, parking and turning space incorporated into the layout.

These design decisions supported the planning case by demonstrating how additional housing could sit within the established group. The proposal addressed the use and arrangement of the land as a whole, connecting the new buildings with the former school and its surroundings.

Securing consent was a significant outcome: it established permission for two additional homes outside a settlement through a coordinated response to the new policy opportunities and the particular characteristics of the site.

Heritage assessment shaping the design

The relationship with the Grade II* listed former church opposite was central to the application. The site’s position within the Cornwall and West Devon Mining Landscape World Heritage Site added a further layer of heritage consideration.

Our detailed Heritage Impact Assessment examined the significance of the affected heritage assets, the contribution made by their setting and the effects of the proposed development.

This included the relationship between the former church, school, surrounding spaces, traditional boundaries and views through which the buildings are experienced.

The assessment informed the positioning, scale and appearance of the houses. Their courtyard arrangement, stepped form and lower rooflines were developed with the prominence of the historic buildings in mind.

Our Heritage Impact Assessment, Design and Access Statement and planning-policy compliance statements presented these considerations as a connected case. Together, they explained the development opportunity, assessed the effects of change and demonstrated the reasoning behind the design.

Building knowledge translated into planning results

Trescol Vean shows the value of continuity in professional advice, combined with an active understanding of changing planning policy.

Our knowledge of the property developed through surveys, nursery adaptations and the residential conversion. That experience provided a foundation for assessing the adjoining land and developing proposals for its future use.

The four-apartment conversion gives the former school a new residential purpose. The separate consent for two houses demonstrates how policy knowledge, sensitive design and detailed heritage evidence can establish additional development opportunities outside settlements.

Across a client relationship spanning more than twenty years, SMT Associates has connected practical building knowledge with planning strategy, helping the property respond to changing needs and securing permission for its next stage of development.