- Scheme
- Three new houses
- Consent route
- Section 73 amendments
- Key benefit
- Less foundation work in bedrock
- Services
- Redesign · Building Regulations · Site administration
The client purchased the site at Trewarmett with planning permission and Building Regulations approvals already in place for three new houses. Construction had commenced, with foundations being excavated for one of the plots, when SMT Associates was appointed to review the approved scheme.
Our brief was to assess whether the consented design could be improved before the project progressed too far. We reviewed the layout, accommodation, construction strategy and relationship between the buildings and the challenging ground conditions. This identified opportunities to improve the scheme while also reducing unnecessary construction complexity.
We proposed a series of design variations that we believed would create a more effective and practical development. The revised arrangement improved the internal planning of the houses, made the buildings easier to construct and reduced the extent of difficult foundation work. The client accepted our recommendations, allowing the project to proceed with a more efficient and buildable design.
Our approach considered both the quality of the finished accommodation and the practical demands of delivering it on site.
Rather than treating the approved drawings as fixed, we examined how the design could be refined to respond more effectively to the site, the construction sequence and the client’s objectives.
Simplifying construction in bedrock
The site presented significant construction challenges, with bedrock affecting the formation of the foundations. The original arrangement required a considerable length of foundation excavation within the rock, creating additional work, cost and risk during construction.
A significant improvement achieved through the redesign was the reduction in the overall length of foundations required within bedrock. By reconsidering the arrangement of the buildings and rationalising the foundation layout, we reduced the extent of difficult excavation and associated foundation construction.
This was an important practical benefit. Working in bedrock can require specialist excavation methods, additional plant and increased time on site. It can also create uncertainty around levels, sequencing and the final cost of the works. Reducing the amount of foundation construction within the rock helped to limit these risks and provided a more straightforward basis for progressing the project.
The revised design therefore connected the architectural improvements directly with the site conditions. It improved the efficiency of the accommodation while also helping to control construction costs and simplify the work required by the contractor.
Planning negotiations and technical redesign
The proposed changes required negotiations with the planners to agree revisions to the approved proposals. SMT Associates prepared and presented the design changes, explaining how the revised scheme improved the layout, responded to the site conditions and supported a more practical construction approach.
The amendments were progressed through a Section 73 application, enabling the approved scheme to be varied while retaining the overall planning permission. We supported the client through the planning process and provided the information required to explain and justify the proposed changes.
Following the planning discussions, we comprehensively reworked the Building Regulations drawings and supporting technical information to reflect the revised scheme. This included updating the plans, sections, elevations and construction information so that the approved design changes were carried through into a coordinated technical package.
The technical redesign ensured that the improvements were not limited to the planning drawings. The revised layout, foundation strategy and construction approach were incorporated into the information required for the project to proceed on site. This provided greater clarity for the contractor and helped reduce the potential for discrepancies between the planning, Building Regulations and construction information.
Contract documentation and site administration
SMT Associates also prepared the contract documentation and specifications required to support the construction phase. The information was developed to provide a clear description of the proposed works, the required standards and the materials and workmanship expected.
The contract documents helped establish a consistent basis for pricing and construction, while the specifications provided additional detail where the drawings alone could not fully describe the work. This was particularly important given the site conditions and the need to coordinate the revised foundation strategy with the wider building design.
During the construction phase, we provided site administration services to help monitor progress and support the delivery of the approved design. This included responding to technical queries, reviewing information as required and liaising with the client and contractor to help resolve issues arising on site.
Our involvement provided continuity from the initial design review through planning, technical design, procurement and construction.
This allowed the practical benefits identified at the outset to be maintained as the project progressed.
Trewarmett demonstrates the value of reviewing an approved project before committing further expenditure. By reassessing the consented design at an early stage, SMT Associates was able to improve the accommodation, simplify the construction process and significantly reduce the foundation requirements in challenging bedrock conditions.
The project also demonstrates how architectural design, planning advice and technical coordination can work together to deliver a more efficient and buildable scheme. Through the Section 73 planning process, the redesign of the Building Regulations information, preparation of contract documents and ongoing site administration, we helped the client move forward with a clearer, more practical and better coordinated project.